Hoboken Roof Deck

Job Details

  • We removed the complete deck system to inspect the roof.

  • We performed a core sample to inspect the first layer of roofing to check for trapped water. We will seal penetration with a modified rubber patch.

  • Set drainage mat under deck frame to protect the new roof membrane.

  • Removed existing decking tops on the 2nd-floor deck and disposed of.

  • We installed new tropical walnut decking to 2nd floor deck.

  • Installed new composite decking to roof and wall.

  • Installed the existing railing system.